Aerosol Filling Plant Lighting: Gassing Rooms, Water Baths and Line Layouts
Lighting an aerosol filling plant: why the gassing room is the critical zone, how propellants set the gas group, the hot water bath, and layouts for a gassing room and a filling hall.
Key points
- The gassing room, where hydrocarbon or DME propellant is injected, is normally Zone 1 inside; the filling hall outside it is often Zone 2 or unclassified, depending on the product.
- Propane, butane and isobutane are group IIA; dimethyl ether (DME) is group IIB with a lower ignition temperature, so a DME line needs IIB and at least T3.
- An 8 × 6 m gassing room at 300 lux needs 6 BDE507 fittings of 60 W (about 346 lux); a 30 × 15 m filling hall needs 24 BED fittings of 120 W (about 367 lux), by our lighting calculator.
- The hot water test bath releases gas from leaking cans and is usually classified, so it needs certified fittings even if the rest of the line does not.
Aerosol plants fill cans with product, crimp a valve on, then inject liquefied propellant under pressure. Most consumer aerosols use flammable hydrocarbon propellants, so every plant has at least one area where large amounts of flammable gas are handled at high pressure. Lighting there is a safety item, and lighting in the rest of the plant depends on how well that area is contained.
The gassing room
Modern plants separate propellant injection from the rest of the line. Cans enter a gassing room or gassing cabinet through small openings, are charged with propellant, and leave. The room is built for the hazard:
- high-rate mechanical ventilation, with extraction at low level because hydrocarbon propellants are heavier than air;
- gas detection that stops the line and boosts ventilation at a set fraction of the lower explosive limit;
- explosion relief panels to an outside wall;
- interlocks so the gassing machine cannot run without ventilation.
Inside, the room is normally classified Zone 1. Industry guidance such as that from the British Aerosol Manufacturers’ Association describes typical arrangements. Outside the gassing room, the filling hall may be Zone 2 near the can openings, or unclassified, depending on the product and the containment.
Propellants and gas group
| Propellant | Gas group | Notes |
|---|---|---|
| Propane | IIA | Heavier than air |
| Butane, isobutane | IIA | Heavier than air; most common blends with propane |
| Dimethyl ether (DME) | IIB | Lower auto-ignition temperature; needs at least T3 |
| Compressed air, nitrogen, CO₂ | Not flammable | No gas zone from the propellant |
A plant that runs only hydrocarbon blends could use IIA fittings, but many plants fill DME products on the same line now or later. IIB or IIC fittings remove that limitation. Products themselves can also be flammable: alcohol-based sprays, solvent-based paints and lubricants add their own vapour at the filling stage. Our IIB vs IIC gas groups article explains the grouping, and the LPG bottling plant lighting guide covers a closely related process.
Worked example 1: an 8 × 6 m gassing room
The gassing room is 8 × 6 m with a 4 m ceiling, painted walls, and a target of 300 lux so operators can watch the gassing heads and spot leaks. Using the BDE507 at 60 W (20–70 W range, Ex d IIC T6 Gb, IP66, 110 lm/W), our lighting calculator gives:
| Result | Value |
|---|---|
| Room index | 1.07 |
| Fittings | 6 (3 × 2) |
| Spacing | 2.7 m × 3.0 m |
| Average illuminance | about 346 lux |
| Power density | 7.5 W/m² |
| Wattage that would just reach 300 lux | about 52 W |
The IIC T6 marking covers every propellant and almost any product solvent. Mount the fittings at high level on the walls or ceiling, away from the low-level extraction and away from the explosion relief panels, so a pressure release does not throw a fitting. We supply the BDE507 certificate with the quotation.
Worked example 2: a 30 × 15 m filling hall
The filling hall holds two lines: product filling, valve insertion and crimping, then the passage to the gassing room, the water bath, and packing. The hall is 30 × 15 m with a 6 m roof, target 300 lux. The area study classifies Zone 2 around the gassing room openings and the water bath, so the plant chose one Zone 1/2 fitting for the whole hall.
Using our BED series at 120 W (Ex db eb mb IIC T4 Gb, our certificate ZJEx23.0914) and a conservative 110 lm/W, our lighting calculator gives:
| Result | Value |
|---|---|
| Room index | 1.92 |
| Fittings | 24 (6 × 4) |
| Spacing | 5.0 m × 3.8 m |
| Average illuminance | about 367 lux |
| Power density | 6.4 W/m² |
| Wattage that would just reach 300 lux | about 98 W |
On the same grid, 100 W BED fittings would give about 306 lux. We would stay at 120 W for the margin at the water bath and packing end, where people inspect cans.
The hot water bath
The EU Aerosol Dispensers Directive requires each filled can to be tested, normally by passing it through a hot water bath, where leaks show as bubbles and over-pressure cans burst. A leaking can releases propellant at the bath. That makes the bath one of the classified areas even in plants where the rest of the hall is not. Fittings over the bath need:
- certification for the zone at the bath;
- IP66 or better, because of steam and splashing;
- good light on the water surface so inspectors can see bubbles; a fitting directly above the bath, aimed at the surface, works best.
Switches, emergency lighting and gas detection
Put switches outside the gassing room. Emergency lighting in the gassing room and filling hall must be rated for the zone; see our explosion-proof emergency light guide. Coordinate the lighting circuit with the gas detection system: some plants keep lighting on during a gas alarm so people can leave, which requires the fittings to be certified for the zone, while non-rated equipment is switched off.
Product warehouse
Finished aerosols are stored in their own warehouse with fire protection designed for aerosol storage. The warehouse is usually unclassified, because cans are sealed, but local rules vary. Ordinary high bays apply unless the classification says otherwise. Our paint manufacturing plant lighting guide covers the solvent side of products that often end up in aerosol cans.
What to send us
- Plans of the gassing room, filling hall and water bath area
- The area classification drawing
- Propellants and products filled
- Lux targets, supply voltage and emergency lighting needs
We return fitting schedules, layouts and calculated levels, with the certificate for each model.
Sources
Frequently asked questions
What is a gassing room in an aerosol plant?
A separate, strongly ventilated room where flammable propellant is injected into filled and crimped cans. It usually has gas detection, explosion relief and interlocked ventilation, and its interior is normally classified Zone 1.
Which gas group do aerosol propellants fall in?
Hydrocarbon propellants such as propane, butane and isobutane are group IIA. Dimethyl ether is group IIB. A IIB or IIC fitting covers both.
Does the aerosol water bath need explosion-proof lights?
Usually yes. Every can is heated in a water bath to check for leaks, and a leaking can releases propellant there. The area around the bath is normally classified, often Zone 1 at the surface and Zone 2 around.
How much light does an aerosol filling line need?
Filling and packing lines are commonly lit to around 300 lux, with more at inspection points such as the water bath exit and checkweighers.