Get a quote

26,000 m² · Xiangtan High-tech Zone

Factory & quality control

Every luminaire we ship passes through our own production and test lines. Here is the route it takes, from bare LED chip to packed carton.

  1. LED packaging

    LED packaging

    LED chips are packaged in a dust-controlled room before board assembly.

  2. SMT placement

    SMT placement

    Automatic pick-and-place machines and reflow ovens assemble the LED boards in a clean room, where operators wear anti-static suits.

  3. Metalwork

    Metalwork

    Our CNC press brake bends sheet steel for brackets, control boxes and pole components.

  4. Assembly

    Assembly

    Housings, optics, drivers and LED boards are assembled and wired on dedicated lines for each product family.

  5. Aging test

    Aging test

    Finished luminaires are switched on in racks and run before packing, so early failures show up here and not on your site.

  6. Integrating sphere

    Integrating sphere

    Lumen output, efficacy, colour temperature and CRI are measured on finished fittings.

  7. Photometric testing

    Photometric testing

    A photometric test station checks optical performance against the product specification.

  8. Temperature testing

    Temperature testing

    Environmental chambers test fittings and components under high and low temperatures.

  9. Packing & warehouse

    Packing & warehouse

    Cartons and pallets are packed and stored for dispatch. For export orders we pack for container transport.

Visit or audit us

You are welcome to visit the factory, send a third-party inspector, or join a live video tour before you order. We are about an hour’s drive from Changsha Huanghua International Airport, and Xiangtan has high-speed rail connections.

BlueGreen OE factory buildings in the German Industrial Park, XiangtanBook a factory visit or video tour