Key points

  • A high mast circuit runs from the site supply to a distribution board in the mast base, then up a trailing cable or plug connection to the lantern ring, where it is split to the floodlights.
  • Our 32 m steel pipe plant mast with 10 × 600 W floodlights draws about 9.6 A per phase on a 380 V three-phase supply (power factor 0.95), against about 29 A if fed single-phase at 220 V.
  • With 10 single-phase floodlights split 4/3/3 over the phases, the busiest phase carries about 11.5 A. A 40 m, 4 mm² trailing cable then drops about 4 V, under 2% at 220 V.
  • The base board usually holds an isolator, circuit breakers per phase group, residual current protection where required, a surge protector, a contactor and a photocell or timer.

A high mast concentrates a lot of power on one pole. Ten or more floodlights of several hundred watts each sit 20–40 m up on a ring that can be lowered for maintenance. The wiring has to carry that power safely up the mast, keep working while the ring moves, and balance the load on the supply. This guide walks through a typical wiring arrangement, using the two 32 m masts we supplied for a steel pipe plant as the worked example.

The project

For the outdoor yard of a steel pipe plant in Xiangtan, we supplied two 32 m high masts: Mast 1 with a full ring of 10 × 600 W LED floodlights, and Mast 2 with a three-quarter ring of 8 × 600 W. That is 6.0 kW and 4.8 kW of connected load. The calculations below use these loads, a 380/220 V three-phase supply as used in China, and an assumed power factor of 0.95. The final cable sizes on any project come from the installer’s calculation to local rules; these figures show the method.

The wiring path, step by step

A high mast wiring diagram usually has five parts:

  1. Feeder from the site supply or a feeder pillar, buried and entering the mast through the foundation.
  2. Base distribution board behind the door at the bottom of the mast.
  3. Trailing cable or plug connection up the inside of the mast to the head frame.
  4. Ring junction box on the lantern ring, where the supply is split.
  5. Floodlight connections from the junction box to each fitting.

The base distribution board

Typical contents, from the incoming supply onward:

Item Purpose
Main isolator Safe isolation of the whole mast for maintenance
Surge protective device Protects drivers from surges on long outdoor feeders; masts are also exposed to lightning
Circuit breakers One per phase group of floodlights, sized to the circuit
Residual current protection Where local rules require it for outdoor lighting circuits
Contactor Switches the floodlights as a group
Photocell, timer or control module Dusk-to-dawn switching, schedules or a link to a central system
Winch circuit Separate breaker and socket or control for a motorised lowering system
Earth bar Connection of the mast, the earth electrode and all protective conductors

The connection to the moving ring

When the ring is lowered, the power connection must follow or disconnect safely:

  • Trailing cable: a flexible multi-core cable hangs inside the mast and moves with the ring. It needs enough length for the full travel, a strain relief at both ends, and a route where it cannot snag on the wire ropes.
  • Plug and socket at the top: the ring connects to a multi-pin socket at the head frame when raised and latched, and disconnects when lowered. Maintenance on the ground is then done on a dead ring, powered for testing through a separate test lead.

Both work; the choice is made with the lowering system design. Our guide to high mast installation covers the lowering gear itself.

Current: why three-phase

Current on a three-phase supply is I = P ÷ (√3 × U × PF); on single-phase, I = P ÷ (U × PF):

Mast Load Three-phase 380 V Single-phase 220 V
Mast 1 10 × 600 W = 6.0 kW about 9.6 A per phase about 28.7 A
Mast 2 8 × 600 W = 4.8 kW about 7.7 A per phase about 23.0 A

Three-phase cuts the current per conductor to a third, which allows smaller cables and lower voltage drop on the feeder.

Balancing the phases

Each floodlight runs on a single phase (220 V phase to neutral), so the fittings are shared out over L1, L2 and L3:

Mast Split Busiest phase
Mast 1, 10 floodlights 4 / 3 / 3 4 × 600 W = 2.4 kW, about 11.5 A
Mast 2, 8 floodlights 3 / 3 / 2 3 × 600 W = 1.8 kW, about 8.6 A

With a count that does not divide by three, one phase carries one extra floodlight. On sites with several masts, alternate which phase carries the extra one so the site load stays balanced. Mark the phase of each floodlight on the ring drawing, so a replacement is wired back the same way.

Voltage drop on the trailing cable

The trailing cable for a 32 m mast needs the mast height plus slack for the terminations and the travel; we assumed 40 m. For a single-phase circuit, voltage drop ≈ 2 × L × I × ρ ÷ A, with copper ρ ≈ 0.0175 Ω·mm²/m. For the busiest phase on Mast 1 (11.5 A):

Trailing cable core size Voltage drop Share of 220 V
2.5 mm² about 6.4 V about 2.9%
4 mm² about 4.0 V about 1.8%
6 mm² about 2.7 V about 1.2%

Voltage drop on the feeder

For a balanced three-phase feeder, line voltage drop ≈ √3 × L × I × ρ ÷ A. With Mast 1’s 9.6 A per phase and a feeder 150 m long:

Feeder core size Voltage drop Share of 380 V
6 mm² about 7.3 V about 1.9%
10 mm² about 4.4 V about 1.2%

Add the feeder and trailing cable drops and compare the total with your local limit; IEC 60364-5-52 Annex G gives 3% for lighting supplied from a public low-voltage network and is a common reference. LED floodlights with wide input ranges, such as our heat pipe stadium and port floodlight rated AC 85–264 V, tolerate voltage variation well, but cable losses are still wasted energy.

Earthing and lightning

A 32 m steel mast is the tallest object in many yards. Points to cover:

  • Earth electrode at the foundation, bonded to the mast, the base board earth bar and the protective conductors.
  • Lightning protection: an air terminal at the top and a low-resistance path to earth, to the standard your site follows.
  • Surge protection in the base board, coordinated with any protection at the main board.
  • Bonding the ring to the mast earth through the cable’s protective conductor.

Controls and lowering circuits

Floodlights are normally switched as a group by a contactor under a photocell or timer. Larger sites link masts to a central control system for schedules and dimming. Keep the winch circuit separate from the lighting circuits, with its own breaker, so the ring can be lowered with the lights isolated.

Commissioning checklist

  1. Insulation resistance test of feeder, trailing cable and ring wiring.
  2. Earth continuity and electrode resistance.
  3. Phase rotation and balance under load.
  4. Operation of the contactor, photocell and residual current device.
  5. Lowering and raising the ring with the power connection, checking the cable path or plug engagement.
  6. Night aiming check, as described in our high mast lighting guide.

For mast structures and specifications, see our high mast pole specification guide.

Sources

  1. BlueGreen OE — 32 m high mast lighting for a steel pipe plant

Frequently asked questions

How is a high mast light wired?

The supply cable enters the mast base from the foundation to a distribution board inside the base door. From there, a flexible trailing cable (or a plug-and-socket connection) carries power up the mast to a junction box on the lantern ring, where each floodlight is connected. Phases are spread across the floodlights to balance the load.

Should a high mast use single-phase or three-phase power?

Three-phase where it is available. A mast with several kilowatts of floodlights draws about a third of the current per conductor on three-phase compared with single-phase, which means smaller cables, lower voltage drop and a balanced load on the supply.

What size cable is used for a high mast?

It depends on the load, the length and the permitted voltage drop. In our 6 kW example, a 4 mm² trailing cable up a 32 m mast keeps voltage drop under 2%, and the feeder size depends mainly on the distance from the supply. Local wiring rules and the installer's calculation decide the final sizes.

Where are the controls for a high mast?

In the distribution board at the mast base: usually a contactor switched by a photocell or timer, or by a central control system. The lowering winch motor, if fitted, has its own separate circuit and controls.

Products in this guide

Have a project?

Ask our engineers

Send us your site details and we will size the system and quote it.

We reply by email within one working day (China time, GMT+8). Your details are only used to answer this inquiry. Prefer chat? Message us on WhatsApp. Have more detail to give? Use the full form.

Related guides